Line 15: Line 15:
 Creates a new task which is a sibling to the selected task at the bottom of their common parent. Creates a new task which is a sibling to the selected task at the bottom of their common parent.
    
-**New Task Before ​Selected Task**\\+**New Task Above Selected Task**\\
 Creates a new sibling task immediately before the selected task. Creates a new sibling task immediately before the selected task.
    
-**New Task After Selected Task**\\+**New Task Below Selected Task**\\
 Creates a new sibling task immediately after the selected task. Creates a new sibling task immediately after the selected task.
 +
 +**New Dependent Task Below Selected Task**\\
 +Creates a new sibling task immediately after the selected task and makes the newly created task dependent on the previously selected task.
    
 **New Subtask at Top of Selected Task**\\ **New Subtask at Top of Selected Task**\\
Line 31: Line 34:
    
 Note: This operation cannot be performed on a task which already has subtasks Note: This operation cannot be performed on a task which already has subtasks
-Note: If time has already been spent on the task then this is allocated entirely to the first subtask.+Note: If any time has already been spent on the task then this is allocated entirely to the first subtask.
    
 **Split Selected Task into '​n'​ Equal Subtasks**\\ **Split Selected Task into '​n'​ Equal Subtasks**\\
Line 38: Line 41:
  
 Creates two or more subtasks and splits the time estimate equally between them. Creates two or more subtasks and splits the time estimate equally between them.
-(also see notes for previous item).+(See notes for previous item).
    
  
new-task-menu.txt · Last modified: 2016/09/10 02:45 by admin