Task length not conserved when moved in WeekPlanner Topic is solved

Moderator: abstr

Locked
mrgary
Posts: 2
Joined: Mon Nov 25, 2019 4:16 am

Task length not conserved when moved in WeekPlanner

Post by mrgary » Mon Nov 25, 2019 4:30 am

Version 7.2.20: When two tasks overlap in time, and moving one of the tasks the task length is not conserved but either the start or end time is conserved. While dragging the task, however, the task length is preserved. But when unclicking the mouse, the task length suddenly increases by the same amount it was moved upwards or downwards. The same happens also when only one task is shown in the week planner.
Attachments
task view
task view
Screenshot (33).png (171.98 KiB) Viewed 5999 times
week planner before moving left task upwards
week planner before moving left task upwards
Screenshot (32).png (171.45 KiB) Viewed 5999 times
week planner after moving left task upwards. duration doubled, instead of moved up on top of the right task
week planner after moving left task upwards. duration doubled, instead of moved up on top of the right task
Screenshot (31).png (146.98 KiB) Viewed 5999 times

User avatar
abstr
Site Admin
Posts: 368
Joined: Sun Jul 28, 2019 12:22 pm

Re: Task length not conserved when moved in WeekPlanner

Post by abstr » Mon Nov 25, 2019 11:31 pm

Thx Gary.

Can you attach a recorded bug report (Help > Record Bug Report) together with the tasklist used please?

mrgary
Posts: 2
Joined: Mon Nov 25, 2019 4:16 am

Re: Task length not conserved when moved in WeekPlanner

Post by mrgary » Tue Nov 26, 2019 2:15 am

See attached Bug recording (using OBS Studio).
See attached tds file "before".
See attached tds file "after".
Attachments
todolist-weekplanner-move-tasks-video.zip
(399.64 KiB) Downloaded 228 times
todolist-weekplanner-move-tasks-before.tdl
(3.79 KiB) Downloaded 238 times
todolist-weekplanner-move-tasks-after.tdl
(3.79 KiB) Downloaded 229 times

User avatar
abstr
Site Admin
Posts: 368
Joined: Sun Jul 28, 2019 12:22 pm

Re: Task length not conserved when moved in WeekPlanner

Post by abstr » Tue Nov 26, 2019 4:49 am

Cool thanks.

User avatar
abstr
Site Admin
Posts: 368
Joined: Sun Jul 28, 2019 12:22 pm

Re: Task length not conserved when moved in WeekPlanner

Post by abstr » Fri Dec 06, 2019 6:58 am

Fixed in 7.2.21

Locked