Hi Dan,
In the kanban it is not possible to drag a task to another column if the attribute to track is a custom task attribute.
There is one exception : when the custom task attribute is placed at the top in the list in the "custom task attributes" dialog window, then dragging is possible (after a restart of the program)
But when you put the same custom task attribute not at the top in the list, dragging becomes impossible.
kanban : dragging not possible if attribute to track is a custom task attribute Topic is solved
Moderator: abstr
kanban : dragging not possible if attribute to track is a custom task attribute
- Attachments
-
- Introduction.tdl
- (50.66 KiB) Downloaded 117 times
Re: kanban : dragging not possible if attribute to track is a custom task attribute
Just to confirm - the problem arises only for 'New Attribute B' in your example tasklist?
Re: kanban : dragging not possible if attribute to track is a custom task attribute
Hi Dan,
I made a new introduction.tdl to illustrate. with 4 custom attributes. For each of them the same issue. When the 'attribute to track' in the kanban is the custom attribute placed at the top in the list in the custom task attributes dialog window, the task can be dragged in kanban. When the 'attribute to track' is the same attribute but not placed at the top in the list in the custom attributes dialog, the task cannot be dragged in kanban.
so if attribute A is placed at the top, it's ok for attribute A, not for B,C,D. if attribute B is placed at the top, it's ok for attribute B, not for A,C,D. if attribute C is placed at the the top, it's ok for attribute C, not for A,B,D. if attribute D is placed at the top, it's ok for attribute D, not for A,B,C.
I made a new introduction.tdl to illustrate. with 4 custom attributes. For each of them the same issue. When the 'attribute to track' in the kanban is the custom attribute placed at the top in the list in the custom task attributes dialog window, the task can be dragged in kanban. When the 'attribute to track' is the same attribute but not placed at the top in the list in the custom attributes dialog, the task cannot be dragged in kanban.
so if attribute A is placed at the top, it's ok for attribute A, not for B,C,D. if attribute B is placed at the top, it's ok for attribute B, not for A,C,D. if attribute C is placed at the the top, it's ok for attribute C, not for A,B,D. if attribute D is placed at the top, it's ok for attribute D, not for A,B,C.
- Attachments
-
- Introduction.tdl
- (51.51 KiB) Downloaded 123 times