Task length not conserved when moved in WeekPlanner Topic is solved
Moderator: abstr
Task length not conserved when moved in WeekPlanner
Version 7.2.20: When two tasks overlap in time, and moving one of the tasks the task length is not conserved but either the start or end time is conserved. While dragging the task, however, the task length is preserved. But when unclicking the mouse, the task length suddenly increases by the same amount it was moved upwards or downwards. The same happens also when only one task is shown in the week planner.
- Attachments
-
- task view
- Screenshot (33).png (171.98 KiB) Viewed 8722 times
-
- week planner before moving left task upwards
- Screenshot (32).png (171.45 KiB) Viewed 8722 times
-
- week planner after moving left task upwards. duration doubled, instead of moved up on top of the right task
- Screenshot (31).png (146.98 KiB) Viewed 8722 times
Re: Task length not conserved when moved in WeekPlanner
Thx Gary.
Can you attach a recorded bug report (Help > Record Bug Report) together with the tasklist used please?
Can you attach a recorded bug report (Help > Record Bug Report) together with the tasklist used please?
Re: Task length not conserved when moved in WeekPlanner
See attached Bug recording (using OBS Studio).
See attached tds file "before".
See attached tds file "after".
See attached tds file "before".
See attached tds file "after".
- Attachments
-
- todolist-weekplanner-move-tasks-video.zip
- (399.64 KiB) Downloaded 380 times
-
- todolist-weekplanner-move-tasks-before.tdl
- (3.79 KiB) Downloaded 371 times
-
- todolist-weekplanner-move-tasks-after.tdl
- (3.79 KiB) Downloaded 385 times
Re: Task length not conserved when moved in WeekPlanner
Fixed in 7.2.21